D Stage (Tank)
Specification
Dimensions | ||
---|---|---|
Length | 120ft | 37m |
Width | 90ft | 27m |
Pitched Roof *highest point | 26.9ft | 8.2m |
Pitched Roof *lowest point | 19.1ft | 5.8m |
Stage Size | 10,800ft² | 999m² |
All measurements are approximate and should be verified before commencement of works. |
Tank Lid | ||
---|---|---|
Maximum Tank Decking Load (when used as a dry stage) | 1,000Kg / per 10 ft² | 1,000Kg / per m² |
Tank Dimensions | ||
---|---|---|
Length | 60ft | 18m |
Width | 60ft | 18m |
Depth | 20ft | 6m |
Volume | 72,000ft³ | 2,039m³ |
Water Capacity | 448,476 gal | 2,038,515 ltr |
Heated | Yes, triple gas boiler system with two heat exchangers | |
Filtered | Yes, UV purifcation system with automatic chemical dosing and 10 large sand filters | |
Chemicals | Typical frst week 32 drums of liquid chlorine and 250kg dry acid. This tends to reduce once the chemical balance is stabilised |
Tank Hire Includes |
---|
Tank labour (5 days p/wk OT applies after 10 hours and 6th & 7th day), Filling (2,500,000 liters to fill plus back-washing), heating (natural gas for initial warm up to 32°C), filtration system and chemicals (approx. 32 drums of liquid chlorine per week & 250kg dry acid powder per week). |
Runway/Lifting Beams | ||
---|---|---|
SWL - Load Between Trusses | 1,102lb | 500Kg |
Stage Doors | ||
---|---|---|
1 x Large Door | 17'9" x 19'4" | 5.41m x 5.88m |
Floor Type |
---|
Concrete and wood |
Electrical Supply | |
---|---|
Maximum Electrical Load | AC available Load 1.5 megawatts 3Ø / 6no. x 400a powerlock sockets |
Heating |
---|
Air handling units |
Fire Protection | |
---|---|
Sprinkler System | 93 °C |
Smoke Dectectors | Yes |
Note: The stage is protected with a wet sprinkler system. WBSL Studio Support should be notified of any works or effects that are likely to create a high temperature. |
Water | |
---|---|
Water On stage | Yes |
Voice & Data | |
---|---|
Available | Yes |
Number Of Voice/Data Outlets | 20 |
Internet/Network Connectivity | Yes |
Wireless Connectivity | Yes |
D Stage Prep Information | |
---|---|
Stage Conversion (dry/wet) | 1 week |
Filling Time | 2 ½ days |
Heating Time up to 32° | 2-4 days |
Tank Viewing Window | Yes |
Diving
All diving requirements are booked directly between the production and the diving company of choice. Please be advised rental of the tank excludes the following;
- Health and safety requirements/equipment/cover
- Diving services requirements
- Wave machine
The Site
WBSL Site PlanFilter: